The meaning and explanation of the common defects in ship PSC inspection
Reads:2724    AddTime:2017-4-8 16:03:31    Collects this page

 

表 一:

Code

Actions to be Taken

 

00

No Action Taken   

 

10

Deficiency Rectified  

 

12

All Deficiencies Rectified   

 

15

Rectify Deficiencies At Next Port    

 

16

Rectify Deficiencies Within 14 Days  

 

17

Master Instructed to Rectify Deficiencies Before Departure   

 

18

Rectify Deficiencies Within 3 Months   

 

19

Entrance Prohibition for ship without Certification   

 

20

Ship Delayed to Rectify Deficiencies   

 

25

After Delay Allowed to Sail (*Specify Date)   

 

30

Ship Detained   

 

35

Detention Rised  (*Specify Date)  

 

36

Ship allowed to sail after follow-up detention   

 

40

Next Port Informed    

 

50

Flag State /Consul Informed  

 

55

Flag State Consulted   

 

60

Region State Informed   

 

70

Classification Society Informed   

 

80

Temporary Substitution of Equipment   

 

82

Alternative equipment or method used   

 

85

Investigation of Contravention of Discharge Provision (MARPOL)

 

90

Letter of warning issued   

 

95

Re-inspection Connection with Code 90   

 

96

Letter of Warning Withdrawn  

 

97

Destination Unknown Information   

 

99

Other (Specify)   

 

表 二:

Code

Meaning

Actions Taken

 

A

Detained

Grounds for detention   

 

B

Rectified

Deficiency rectified  

 

C

Before Departure

Rectify the deficiency before departure

 

D

Within 14 days

Rectify the deficiency within 14 days(1)  

 

E

At the next port

Rectify the deficiency at the next port(1)

 

F

Agreed Class Condition

As in the agreed class condition  

 

G

Within  3 Months

Rectify non-conformity in three months(2)

 

H

Major NC

Rectify major non-conformity before departure (3)

 

J

At Agreed repair port

At an agreed repair port (4)    

 

K

Temporary repair

Temporary Repair to be carried out   

 

L

Flag consulted

Flag State Consulted   

 

M

LOW issued

Letter of Warning issued   

 

N

LOW withdrawn

Letter of Warming withdrawn   

 

O

Operation Stoped

Prohibition to continue an operation   

 

P

Temporary Substitute

Temporary substitute of the equipment

Total:2 pages  page: 12   

Previous:   Next:Freight terms in English and Chinese
【Refresh】【Collection】【Print】 【Close Window】
Mr.Wang: 86-518-85428011,85428029   Miss Wang: 86-518-85428026   
Address: Room 501/502B Landbrige Inernational Busniss Building Haitang Rd No.188, Lianyungang E-mail: chartering@panasialyg.com
Panasia Logistics(Lianyungang) Co.,Ltd Copyright| sitall.net Support  [管理]