(a) container yard / container yard (CY TO CY):
1. The shipper take the empty container, packing, tally, sealed by himself, and will be responsible for sending to the designated container yard, bear all the costs and risks before . The descriptons of goods, the inspection of goods , weight,quantity to be said by the shipper.
2. Loss of or damage to goods ,the shipper shall also shoulder due to improper stowage and mistally.
3. The carrier received the heavy box in the container yard at loading port and delivers the heavy box in the container yard at discharging port.
4 .Consignee took over container from the delivery point of the container yard and is responsible for unpacking heavy box , after unpacking delivered to the carrier designated site.
(b) container freight station / container yard (CFS TO CY):
1. .Consignee took over container from the delivery point of the container yard and is responsible for unpacking heavy box , after unpacking delivered to the carrier designated site..
2. .Consignee took over container from the delivery point of the container yard and is responsible for unpacking heavy box , after unpacking delivered to the carrier designated site.
(c) container freight station / container freight station (CFS TO CFS):
1 .Consignee took over container from the delivery point of the container yard and is responsible for unpacking heavy box , after unpacking delivered to the carrier designated site.
|